Documents
Searchresults
Found 508 documents.
ERA-LEARN 2020 Newsletter #3 (May 2016)
The newsletter features latest news and information on: *) Evaluation of Joint Programming to Address Grand Societal Challenges; *) Proceedings of the Annual Joint Programming Conference, 14-15 January 2016, Brussels; *) New GPC Chairman; *) New ERA-NET Cofunds: from biotech to manufacturing; *) Workshop on Stakeholder Involvement in JPIs; *) Mutual Learning Exercises (MLE’s); *) News from the ERA-LEARN 2020 portal
Category: Newsletter
Alignment Mapping Report
This alignment mapping exercise builds on an online survey that was formulated by the GPC implementation group for alignment and improved interoperability, in communication with GPC and the JPIs. The survey was open June to September, 2015 and 22 completed questionnaires were collected. One submission was accepted per GPC member or observer country.
Category: Report
GPC Meeting 2016-04-29: summary conclusions
Summary conclusions of the High Level Group for Joint Programming (GPC) Meeting on 29 April 2016.
Category: Report
GPC Meeting 2016-04-29: Slovak presidency presentation for GPC
Slovak presidency presentation for the High Level Group for Joint Programming (GPC) Meeting on 29 April 2016.
Category: Report
Final report of GPC implementation group 2: Alignment and improving Interoperability
The GPC implementation group for alignment and improved interoperability, IG2, was given the task to ”develop strategies, instruments and methods to boost alignment from both the Joint Programming Initiative (JPI) and the member/associated states (MS) side with input from JPIs, MS, the European Commission (EC) and other stakeholders”. The work is based on the GPC alignment working group report from 2014 and focuses on the governance from the side of the member/associated states. National alignment is a precursor to effective cooperation at the European level. Preparing the national system for European partnerships is also a key factor for less frequently represented countries to be able to join additional JPIs.
Category: Report
GPC Meeting 2016-04-11: GPC Mandate
Mandate of the High Level Group for Joint Programming (GPC).
Category: Report
ERA-NET Cofund in Horizon 2020
Summary presentation on "ERA-NET Cofund in Horizon 2020" by the European Commission.
Category: Slides
Guidelines for Independent Observers for the co-funded call
The requirement to provide an independent observer’s report on the evaluation is mandatory for all EU co-funded joint calls including FP7 ERANET Plus projects, joint calls implemented under Article 185 initiatives and the main [co-funded] joint call of Horizon 2020 ERA-NET Co-fund projects.
Category: Manual
Comparison of FP7 ERA-NET & FP7 ERA-NET Plus with H2020 ERA-NET Cofund
Table comparing FP7 ERA-NET & FP7 ERA-NET Plus with H2020 ERA-NET Cofund.
Category: Slides
Evaluation of Joint Programming to Address Grand Societal Challenges
Evaluation of Joint Programming to Address Grand Societal Challenges -Final Report of the Expert Group published.
Category: Report
Example Energy Impact Report: February 2016 (projects funded under the 2009 EMRP Call)
A summary of the outputs and impact of the finished EMRP joint research projects in Energy. The aim of this theme is to establish the measurement infrastructure necessary to support Europe’s sustainable energy goals. The research is focused on technologies that support reduced greenhouse gas emissions and the security of Europe’s energy supply.
Category: Example
Final report of GPC Implementation Group 1: Fostering and mentoring JPIs
GPC Implementation Group 1 (IG1, “Fostering and mentoring JPIs”) was created to:
- Implement the recommendations of the GPC Working Groups 1 “Fostering the relationships between GPC and the JPIs” and 2 “Framework Conditions”
- To establish a forum for exchange of information/and coordination between JPIs and between JPIs/GPC/European stakeholders
- To work towards the advancement of implementation of the Framework Conditions
Category: Report
GPC Meeting 2016-02-12: summary conclusions
Summary conclusions of the High Level Group for Joint Programming (GPC) Meeting on 12 February 2016.
Category: Report
Example Final Assessment of M-ERA.NET
M-ERA.NET has an excellent database, with a lot of well selected data compiled from call operation, proposal evaluation, and from beneficiaries during the lifetime of M-ERA.NET. In addition, data is used in this report which was compiled during the operation of M-ERA.NET predecessors MATERA and MNT-ERA.NET, or displayed in their final assessment reports.1 Furthermore, a SWOT workshop and two web surveys – directed at M-ERA.NET work members and at beneficiaries and proposers – were performed to complete the data base for this assessment. Main findings of the evaluation and practical insight are summarised in the following.
Category: Example
Annual Joint Programming Conference 2015 Report on Day 3 Session 4
This lecture was held at the Annual Joint Programming Conference 2056
Category: Slides
Annual Joint Programming Conference 2015 Report on Day 1 Session 4
This lecture was held at the Annual Joint Programming Conference 2052
Category: Slides
Annual Joint Programming Conference 2015 Report on Day 2 Session 3
This lecture was held at the Annual Joint Programming Conference 2055
Category: Slides
Annual Joint Programming Conference 2015 Report on Day 1 Session 3
This lecture was held at the Annual Joint Programming Conference 2051
Category: Slides
Annual Joint Programming Conference 2015 Report on Day 2 Session 2
This lecture was held at the Annual Joint Programming Conference 2054
Category: Slides
Annual Joint Programming Conference 2015 Report on Day 1 Session 2
This lecture was held at the Annual Joint Programming Conference 2050
Category: Slides