Project: Improvement of Renewables-based System Services Through Better Interaction of European Control Zones (FR-DE-PT)
This project addresses two important problems faced today by power systems with high penetration of renewable energy sources (RES): the provision of ancillary services by RES and the European-wide frequency containment reserve. This is done by demonstrating advanced solutions for a Virtual Power Plant. The benefits of these new solutions will be evaluated considering improved estimation of weather events and short-term prediction at EU-wide scale. The relevance of this project to the call lies on: 1) the sharing of previous experiences between the partners and across EU borders and 2) the increase of the TRL for the technologies previously developed by the partners. In a short time scale this will: 1) allow RES developers to add additional revenue streams to their existing and future power plants, 2) remove barriers to additional development in systems with a high penetration of renewables and 3) reduce the cost of the reserve for network operators.
Acronym | REStable (Reference Number: 77872) |
Duration | 01/04/2016 - 18/02/2019 |
Project Topic | System Services, Renewable energies, Smart Grid, System stability, Virtual power plant, Frequency reserve, 100% renewables |
Network | ERANet SmartGridPlus |
Call | ERA-Net Smart Grids Plus - Joint Call for Proposals |