Project: SELF-INSTALLED TYRE-BASED ANTI-SCOUR SYSTEM IN OFFSHORE WIND SELF-FLOATING GBS TOWERS
Acronym | ELITYRE2 (Reference Number: 11133) |
Duration | 28/02/2017 - 28/12/2018 |
Project Topic | Our project is related to the offshore wind industry and represents an improvement to gravity base systems (GBS) in towers. We want to develop a system to install anti-scour material (tyre-filled nets) around a self-floating GBS (in the dry dock) so that it works once the wind tower is at its final position on the sea bed. We will produce a detailed design and also an actual 1:1 prototype based on our H2020 funded currently on going ELISA/ELICAN projects (they refer to the GBS and the tower). |
Network | Eurostars 2 |
Call | Eurostars Cut-Off 6 |
Project partner
Number | Name | Role | Country |
---|---|---|---|
1 | ESTEYCO SAP | Coordinator | Spain |
2 | Norfolk Marine Ltd | Partner | Ireland |