Project: Load Control for the Wavepiston Energy Collector
Acronym | LOCWEC (Reference Number: 11849) |
Duration | 01/02/2018 |
Project Topic | The project will make wave energy competitive by increasing the amount of wave energy harvested and reduce installation and maintenance costs. Wavepiston is a wave power system where plates move back and forth pumping pressurised seawater to a turbine-generator station on shore. The challenge which we seek to address is the stress on the plates in extreme weather. The objective is to develop and test a load control system in collaboration with Fiellberg (specialised in seawater hydraulics). |
Network | Eurostars 2 |
Call | Eurostars Cut-Off 8 |
Project partner
Number | Name | Role | Country |
---|---|---|---|
1 | Wavepiston A/S | Coordinator | Denmark |
2 | Fiellberg O.Y. | Partner | Finland |