Project: Offshore Floating Wind Innovative Rigid Pipe TLP Mooring System

Acronym FOW-TLP-C2S (Reference Number: 115026)
Duration 01/05/2021 - 01/11/2023
Project Topic Mooring and installation system enabling floating offshore wind to break the 60m water depth limit for less cost than shallow water system Project utilizes low cost installation vessels that can install and hook up FWTG in <12 hours without expensive cranes or anchor handlers Delivering; Floating offshore TLP mooring system 15MW WTG Mooring analysis Prototype Tendon components Scaled model Gap analysis of existing qualification data Load testing Standardization process for all TLP
Network Eurostars 2
Call Eurostars Cut–off 14

Project partner

Number Name Role Country
1 BlueNewables Partner Spain
2 DTU Wind Energy Partner Denmark
3 GMC Limited Coordinator United Kingdom
4 TUBACEX SERVICIOS DE GESTION Partner Spain